December 1, 2000 P.S. Protest No. 00-16 PITNEY BOWES CORPORATION Solicitation No. 102590-00-A-0165
Decision Pitney Bowes Corporation protests the terms of solicitation 102590-00-A-0165 for high-speed mail processing and insertion systems. On July 7, Headquarters Purchasing posted on the CBDNet a market survey seeking possible sources for "two (2) high speed, high volume intelligent mail processing and inserting systems" which would "accept different stock and envelope sizes, accumulate and process multi-page applications using OMR codes; be capable of changing folding requirements; and produce management reports." Six companies, including Pitney Bowes, responded to the survey. On July 24, the six companies were furnished a copy of solicitation A-0165. The solicitation sought offers for two systems and their maintenance for two years, with options for additional maintenance on those systems and an option for one additional system and its maintenance. Attachment A to the solicitation set out the systems fourteen "mandatory technical requirements," including the following: 1. Cycle Speed Minimum 18,000 per hour. 2. Net Throughput Minimum 12,000 per hour. The specification identified six different items (earning statements, U.S. savings bonds, commercial checks, etc.), their stock size and weight, and the envelope size associated with each item. There were four different stock sizes, two different stock weights, and four different envelope sizes. Systems were to be installed at the Postal Services Eagan, MN, Information Technology Center. Arrangements were made for individual site visits during the week of July 31. Offers were due August 11; installation by September 5 was contemplated by the solicitation.1 Attachment 1 to the solicitation set out the basis on which offers would be evaluated. Offers would first be scored "pass/fail" on the mandatory technical requirements. Offers which met those requirements would then be scored on Technical Capacity (60 points), Past Performance and Supplier Capability (30 points), and Management Plan (10 points). The solicitation was not specific with respect to the relationship of price to the other evaluation factors, but it stated that "[a]ward may not necessarily go to that offeror submitting the lowest price." Pitney Bowess protest was received on August 7. The protest contends that Pitney Bowes is one of "only four . . . console inserter vendors," and that while the other vendors systems have an 18,000 pieces per hour cycle speed, Pitney Bowess system does not. It asserts, however, that it can meet the 12,000 pieces per hour net throughput requirement and notes its willingness to run "a timed production test" to demonstrate its compliance.2 The protest also contends that "the so called technical experts in Eagan are biased to Bell & Howell," and that "judging from . . . conversations with [the purchasing specialist] and the . . . content of the solicitation," Bell & Howell has already been selected. Further, the protest asserts that "[s]ome of the material specifications are misrepresented in the SOW," so that "[o]nly a vendor who has been allowed into the Eagan facility and made aware of the proposed document changes" could be "comfortable with" the throughput speed required. Noting that only two or three inserter sources have delivered to the Postal Service, the protest questions the past performance and capability evaluation criteria, which are also criticized as "subjective and not measurable." Finally, the protest objects to the short delivery time as "unreasonable" absent "prior knowledge of the procurement and configuration." Replying to the protest, the contracting officers statement makes the following contentions:
The contracting officers report also discloses that subsequent to the receipt of the protest, the purchasing process continued, two timely offers and one late offer were received and considered, and that on September 7, while the protest was pending, award was made to Kern International after the Vice President, Purchasing and Materials, determined, as PM 3.6.5.a. allows, that "urgent and compelling circumstances" required the award. In response to this offices inquiry, the contracting officer supplemented his report explaining that Kerns proposal was both the lowest priced and highest technically rated. We are advised that delivery occurred on September 29. Responding to the contracting officers statement, Pitney Bowes makes the following points:
The contracting officer responded to the protesters comments, making the following points:
Pitney Bowes submitted final comments including the following:
Böwe Systec, an interested party, submitted comments contending that it is not unreasonable to impose a cycle speed requirement, and that "a higher cycle speed will always give you a higher net throughput." It expresses some concern about the delivery timeframe, but "find[s] hard to believe" the suggestion that "Eagan has intentionally influenced the bidding process." Discussion The contracting officer has correctly stated the standard applicable to our review of a contention that a specification is unduly restrictive. Where a protester alleges that a solicitation is unduly restrictive, it is incumbent upon the procuring agency to establish prima facie support for its contention that the restrictions it imposes are reasonably related to its needs. But once the agency establishes this support, the burden is then on the protester to show that the requirements complained of are clearly unreasonable. Once the Postal Service establishes prima facie support for the allegedly restrictive requirements, the protester must present an extremely high level of proof to show that those restrictions are clearly unreasonable. The determination of what constitutes the Postal Service's minimum needs is properly to be made by the requiring activity, and is not subject to being overturned in the absence of a clear showing that the determination lacks a reasonable basis. If a specification is otherwise reasonable, the fact that one or more potential offerors may be precluded from participating in the solicitation does not render its terms restrictive if they reflect the legitimate needs of the procuring activity. This office will not substitute its judgment for that of the technical personnel absent fraud, prejudice, or arbitrary and capricious action. Flamingo Industries (USA) Ltd., et al., P.S. Protest Nos. 99-01 05, May 6, 1999, quoting Memorex Telex Corporation, P.S. Protest No. 92-73, January 8, 1993 (citations and internal quotations omitted). Pitney Bowess principal objection here is to the use of cycle speed as a proxy for throughput. The contracting officer has established an adequate prima facie case that cycle speed is a commonly promoted in the industry as a feature of inserting machines, and has explained why the Postal Service has chosen cycle speed, in addition to net throughput, as measures for the systems it wished to buy. The protesters rebuttal has not risen to the high level of proof necessary to overturn those conclusions. While it is undoubtedly the case that throughput can vary from machine to machine, the protester has not persuasively demonstrated that its machine could process the required items at a throughput rate which was 85 percent of its inserters cycle speed. The contention that the source selection was the result of favoritism also cannot prevail. As the contracting officer notes, contentions of bias must be supported by more than surmise. See, e.g., Pitney Bowes Inc., P.S. Protest No. 89-22, July 7, 1989. Not only was Pitney Bowess concern unsupported, it was overtaken by subsequent events. Pitney Bowess remaining concerns are moot. Since Pitney Bowes could not offer an inserter which met the mandatory cycle speed requirements, its objections to the solicitations misdescription of the earning statements orientation, the evaluation criteria, and the delivery schedule lack standing. "Since a protester may protest only on its own behalf and lacks standing as an interested party to protest generally for [or] on behalf of another any issue raised by these protesters concerning [a matter which has not affected them] is moot." Atlanta Regional Distribution Center, et al.; River City Distribution Center, P.S. Protests No. 97-26; 29, April 17, 1998.6 The protest is denied.
The solicitation did not advise offerors of the date on which it was contemplated that award would occur. We understand Purchasing Manual 2.2.5, Delivery or Performance Schedule, and Provision 2-2, Time of Delivery (January 1997), which it discusses, to contemplate the inclusion of an assumed date of award in all solicitations calling for delivery in terms of a calendar date, and that commercial solicitations are not excepted from that practice. 2In an earlier letter to the postal purchasing specialist, a copy of which accompanied its protest, Pitney Bowes asserted that many factors (jams per hour, ease of recovery, job change-over time, etc.) which can affect throughput and that "[t]he most important factor in production is having a system that does not stop." The Postal Services reply included the following:
3The contracting officer offers various pieces of descriptive literature said "consistently [to] list cycle speed as a standard performance measurement." The literature supplied includes that of Pitney Bowes, some of which refers to speeds (e.g., "14 Series -- 14,000 per hour" and "[the 14 series] will process documents at a rate of 14,000 per hour.") not further described. In response to our inquiry, the contracting officer indicated his understanding, based on discussions with the protesters representative, that these figures represented cycle speeds. 4In its comment, Pitney Bowes refers to its inserter as having a cycle speed of 12,000 but of being capable of meeting the 12,000 per hour net throughput speed. It is apparent both from the record (see footnote 2, supra) and Pitney Bowess final comments that it intended to quote a 14,000 insertions per hour cycle speed. 5The factors weighing against such tests in this case included the size of the contract; the lack of space at Eagan for side-by-side tests; and the time and expense the tests would consume. 6Pitney Bowess objections to the use of past performance and capability as evaluation factors are without merit. While it would have been preferable for the for the misdescription to have been corrected by solicitation amendment,
|