December 2, 1998 P.S. Protest No. 98-21 Janice Reilly Solicitation No. 980-114-98
Decision Ms. Janice Reilly protests her failure to receive a contract for the box delivery of mail and the contracting officers decision to resolicit the requirement. The Seattle Branch, Western Distribution Networks, issued solicitation 980-114-98 on May 13, 1998, requesting proposals for HCR 98667, box delivery service out of the White Salmon, WA, post office in south-western Washington, about 40 miles east of Portland, OR, for a term from August 15, 1998, to June 30, 2000. The service involved delivery to 295 boxes over a 42.7 mile route, a total of 12,941 estimated annual miles and an estimated 1,869 annual schedule hours. The solicitation required a station wagon with 90 cubic feet of load space, and, in winter, 4-wheel drive. Under the "Box Delivery Contractor Pilot Program," the vehicle was required to be white in color and not more than five years old at the start of the contract term and to be replaced at the contractors expense when it becomes more than eight years old during the contract term. The solicitation included a Department of Labor Service Contract Act wage determination dated June 1, 1997, establishing the wages for hired drivers, contractor employees who must be compensated at wages set by the Secretary of Labor. (An individual contractor performing the driving himself or herself need not receive Service Contract Act wages.) Proposals were due June 29. Three proposals were received, of which that of Ms. Reilly was the lowest. Ms. Reillys proposal appears to have met the solicitations service requirements completely.1 Ms. Reillys price was compared to other routes using the Highway Contract Support System computer to prepared a Form 5427. The computer selects routes within the same area as the selected route and which are similar to the base route in terms of miles and hours. The Form 5427 listed five comparable routes, four in Washington state and one in Oregon, whose annual hours ranged from 1,495 to 2,187, whose mileage ranged from 10,819 to 15,183, and which involved from 185 to 414 box deliveries.2 The annual rates on the comparison routes were adjusted by the consumer price index to bring them to current comparability. Ms. Reillys offered rate per mile was more than 47% higher than the average rate per mile of those five comparison routes.3 The contract specialist who reviewed the price comparison recognized that Ms. Reillys offer exceeded the comparables, but, in the absence of the contracting officer, proceeded with a determination of Ms. Reillys capability. At a pre-award conference with Ms. Reilly on July 28 various matters were discussed, including adjustments in the allocation of costs on Ms. Reillys cost worksheet (but no change in the overall annual cost), the fact that a new wage determination had been issued and would be incorporated into any resulting contract,4 and the contract specialists advice that Ms. Reillys "cost was excessive in comparison to like contracts" and that "the Contracting Officer had been out of the office, and that the award to her had not been approved." Following his return to the office, the contracting officer reviewed Ms. Reillys offer, concluding that her price "was not fair and reasonable" and that the solicitation would be canceled and the service readvertised. Ms. Reilly was so advised, and requested that the decision be reconsidered. The contracting officer declined to reinstate the solicitation and award to Ms. Reilly, and so advised her, furnishing her in the process information about the cost comparison which had been made. 5 Ms. Reillys protest followed. In two letters dated August 21, one to the contracting officer, and the other to this office, she makes the following points:
The contracting officers statement on the protest explains that the previous regular contractor on this route and another White Salmon route (HCR 98673) was terminated for default for failure to maintain the required insurance. Service on both routes was the subject of emergency contracts, and each route was solicited for a regular contract. The low offer for HCR 98673, a "difficult route" involving a long layover, was 14% higher than the routes to which it was compared, but award was made at that price. He further notes that "contracts this year have been coming in about 10% to 15% higher than comparable routes." Ms. Reillys offer, however, more than 47% higher than its comparables, was not considered fair and reasonable. Her complaint that the comparisons to other routes was unfair was not valid because the solicitation requires only a vehicle less than five years old at award and less than eight years old during the contract term, not a new vehicle. Most contractor vehicles fall within those parameters. In response to this offices request for clarifications, the contracting officer provide information on the location of the comparison routes and their vehicle requirements, as summarized above. The protester submitted comments on the contracting officers statement which made the following points:
The contracting officer was asked to comment on the protesters comments. His response made the following points:
The protester submitted comments on the contracting officers rebuttal which reasserted several points previously made. The protester reasserts that White Salmon remains a unique route, both in terms of weather and vehicle requirements, and that the Pilot Program requirements have a significant effect on price. Discussion "We will overturn [a contracting officers decision to cancel a solicitation and resolicit] only if it is arbitrary, capricious or not supported by substantial evidence." Barretti Carting Corporation, P.S. Protest No. 92-92, December 23, 1992. As the protesters comments recognize, under the Purchasing Manuals guidance, solicitations should be canceled only for a compelling reason. That all offers were received were excessive in price is a compelling reason. Lewis F. Rice, P.S. Protest No. 96-14, July 25, 1996. See also Russell L. Kingston, P.S. Protest No. 93-13, August 27, 1993, (upholding rejection of bids as excessive where the lowest bid was 55% higher than that of a comparable route, and 14% higher than the contracting officers estimate for the route and noting earlier decisions upholding the rejection of all offers when the low offers were 16.5% and 18% higher than the postal estimate, and that the Comptroller General had upheld rejection of a low bid only 7.2% higher than the government estimate). The protesters contention is, however, that her price is not excessive, asserting that differences between the terms of this solicitation and those of the comparison contracts (notably with respect to vehicle requirements) and differences in the conditions of the various routes warrant her higher price. In making the comparison, we look at the solicitations requirements, and not solely to the low offer, which contains elements which exceed those requirements. While the comparison routes did not include Pilot Program vehicle requirements, and it may be those prices should be adjusted to some degree to reflect them, the contracting officer is correct in noting that those requirements do not mandate the offerors approach of providing a new vehicle. Accordingly, they cannot be fully responsible for the difference in price between the protesters offer and the comparables. 10 Similarly, although the protester contends that weather and road conditions warrant a higher price than shown in the comparables, the contracting officer notes that two of the five comparable routes (one of which requires a four wheel drive vehicle) are in the vicinity of this route and thus subject to comparable weather and road conditions. Those routes are the second and third lowest in terms of rates per mile among the comparable routes, and as compared to those routes, protesters offer is 59% percent higher. Tthe protester takes no exception to feasibility of performance within the solicitations estimate of the annual hours, so the schedule adequately accommodates the routes difficulty.11 (Cf. Lewis Rice, supra, (contracting officer within his discretion in rejecting offer twice the rate per mile of comparable routes notwithstanding offerors contention that factors such as Alaskas roads, weather, darkness, and mail recipients large numbers of dogs warranted higher price).) "[Because the] contracting officer has considerable discretion to determine whether to cancel a solicitation when offers are excessive in price, . . . this office will not overturn that decision unless the contracting officer has clearly abused his authority." Russell L. Kingston, supra. While she disagrees with the contracting officer's conclusions, the protester has not demonstrated such abuse here. The protest is denied. William J. Jones The solicitations provision describing the basis of award (M.1) gave "first consideration" to "proposals which meet all of the service requirements specified," and among such proposals, to the lowest priced. The comparison form does not disclose the vehicle requirements for the comparison routes. We are advised that three of the routes required passenger vehicles with 40 cubic feet load capacity, one required a 150 cu. ft. mini-van, and one required a 4-wheel drive 40 cu. ft. passenger vehicle. In her final comments in the course of the protest, Ms. Reilly contended that the fifth comparable, which had the lowest rate per mile, should not have been used because its rate per mile was more than 20% less than her rate per mile. That contention was based on a misreading of the contracting officers discussion of the basis on which the comparable routes were selected, and would lead to the illogical requirement that only routes with rates per mile within a 20% range of the route being evaluated could be used for the comparison. Ms. Reillys offer contemplated the part-time use of a hired driver for approximately a third of the annual scheduled hours. The new wage determination requires an hourly wage for driver/casers on rural route delivery of $10.52 an hour instead of $10.21 an hour as previously required. Ms. Reilly was furnished a copy of the Form 5427 setting out the rates of the comparison routes. Because the form disclosed information from those routes which was deeded proprietary to the contractors, the route numbers which would have identified the contractors, were deleted from the form. This contention is irrelevant to the protest, since the cancellation of the solicitation prevents the circumstance to which the protester objects. According to the applicable regulation (Purchasing Manual (PM) 9.8.5), a wage determination received subsequent to the receipt of offers would not be automatically applicable to the resulting contract. While the new determination could be included in the contract by contract amendment, the contractor would be entitled to an appropriate contract adjustment for the change. The contracting officers statement is to the same effect, stating that "if there were hired driver wages, the contractor would be entitled to any allowable increases as a result of [the] application [of the new wage determination to the contract]." Inasmuch as the contracting officer asserts that any resolicitation will include the Pilot Program requirements, this issue is also moot. Although the protester does not identify the source for this statement, it comes from PM 4.2.2.h., Cancellation of Solicitations. Since the solicitation provided at least ten days between contract award and the start of contract performance, and since the protester could withdraw her offer at any time before award, she was not prejudiced by any delay in advising her of the status of award. If, as the protester contends, the Pilot Program requirements explain the 14% increase in the price of the other White Salmon route, 98673, they do not fully explain the significantly larger increase in her price. Nor does the fact that the route requires a station wagon, rather than a sedan, necessarily suggest a higher price. Subarus Manufacturers Suggested Retail Price for a Legacy L station wagon is $200 less than the suggested price for its Legacy L sedan. A routes difficulty might be evident from the speed at which it may be performed, expressed in terms of miles per hour. If this routes annual miles are divided by its annual hours, we get 6.92 miles per hour, only slightly less than the average of the comparables (7.54 mph), and its cost per hour is about 35% higher than the average rate per hour for all five comparables and similarly higher (34.9%) than the average rate per hour of the two routes which the contracting officer has identified as most directly comparable in terms of weather and driving conditions. |