February 21, 1995
P.S. Protest No. 94-53
NEIL DETERDING
Solicitation 020312-90-A-0062
Digest
Protest against the evaluation of offers for a Contract Postal Unit is
sustained where evaluation was arbitrarily conducted on basis inconsistent
with solicitation's evaluation criteria.
Decision
Mr. Neil Deterding protests the evaluation of offers for the
establishment of a contract postal unit (CPU) for the community of Border,
AK, under solicitation 020312-90-A-0062, issued September 28, 1994, by the
Administrative Service office of the Alaska District, U.S. Postal Service.
The record reflects that the community of Border consists primarily of
a compound of residential buildings maintained by the General Services
Administration (GSA) at the Customs and Immigration port of entry on the
Alaska-Canada border. The community also includes the protester's
commercial facility known as the Border City Lodge, comprising a lodge,
cafe, gift shop, and gasoline station, which is on the Alaska Highway
about three miles from the port of entry. The postal facility nearest to
Border is Northway, AK, some fifty miles away.
As originally issued, the solicitation described the area or location
in which the CPU was to be located as follows:
Within one mile west on Alaska Highway from US Customs at the US Border
AK.
As amended on October 19 by Amendment A01, that description was revised
to read:
Within community of Border Alaska west on Alaska Highway from US Customs
at the US Border AK.
The Border City Lodge was not within the initially described location;
it is within the revised description.
The solicitation contemplated that the facility would occupy 100 square
feet and would be open to the public ten and one-half hours a week (1:00
pm to 4:30 pm Monday, Wednesday, and Friday).
Section M of the solicitation indicated that offers would be evaluated
on the basis of specified evaluation factors, called the business score,[1]
and that award would be made on the basis of a weighted combination of the
business score and the price score.[2]
Two offers were received. One was from Ms. Susan L. Schwartz, a
resident at the port of entry compound, who was currently operating the
CPU under an existing "emergency" contract. Her proposed
facility was located in her residence within the compound. The other
proposal was Mr. Deterding's, for a facility located within the Border
City Lodge.
The offers were evaluated by the postmaster at Northway, AK. She gave
Ms. Schwartz a business score of 95 (24 points for suitability of
location; 25 points for suitability of facility; and 45 points for ability
to provide service),[3] and she gave Mr. Deterding a
business score of 64 (12 points for suitability of location; 16 points for
suitability of facility; and 36 points for ability to provide service).[4]
Ms. Schwartz had offered an annual rate somewhat higher than Mr. Deterding,
but received a higher total score under the formula set out in the
solicitation. Award was made to Ms. Schwartz for service effective
December 1.
Mr. Deterding's protest dated December 12 was received on December 14.
The protester contends that his offer should have been evaluated more
favorably, and that Ms. Schwartz's offer should have been evaluated less
favorably. We summarize the points of the protest as follows:[5]
-- Both offerors should be given equal credit for being within the
desired location; Mr. Deterding's location is not inconvenient to the
residents of the compound, "the vast majority [of whom] travel
considerably further for postal service" than the one-mile radius
originally specified.
-- Ms. Schwartz's facility is not easily accessible to handicapped
customers because it lacks a wheelchair ramp or lift and the hallway and
doors leading to it "are not fitted to provide such access."
The protester's facility is handicapped accessible.
-- Ms. Schwartz's facility will not "stimulate use by
customers" since it is within a fenced compound marked with signs
such as "Do Not Enter" and "Authorized Personnel
Only."[6] Visitors will not know that the facility
is available for postal transactions. The protester's facility, on the
other hand, is fully available to travellers.
-- Ms. Schwartz's facility has little provision for parking; "once
[a customer] enters the compound, he is in the residents'
driveways." While the available parking may be sufficient for the
residents of the compound, it is not adequate for a facility intended to
stimulate postal use. The protester's facility, on the other hand,
includes ample parking.
-- Ms. Schwartz and Mr. Deterding should be evaluated similarly with
respect to relevant experience. While Ms. Schwartz has had three months'
experience running a postal facility, Mr. Deterding's business
experience as owner of the Border City Lodge is more than sufficient to
meet the requirement.
-- The non-postal services provided at Mr. Deterding's location are
fully compatible with the postal services to be provided, as they will
increase the number of persons exposed to the postal services.[7]
-- The personnel assigned to the port of entry are on fixed tours;
awarding the CPU contract to one of them requires frequent
resolicitation. Mr. Deterding, on the other hand, wishes to be a
long-time provider of postal services in the community.
The contracting officer's statement includes the following points:
-- Border, AK, is a small community; in 1991 it was estimated that the
census area within which it is located was comprised of only 29
individuals and only ten housing units, eight or nine of which were
within the port of entry compound. The port of entry was established in
or about 1988; since at least 1990, the CPU has been located within the
port of entry compound.
-- The evaluator did not penalize the protester's offer for being
outside the community area.
-- While the protester's facility is currently handicapped accessible,
Ms. Schwartz's facility can be made so. While some Alaskan post office
facilities have obtained waivers for accessibility, the Postal Service
does require that the Border facility be accessible and has advised the
contractor accordingly.
-- While the protester's facility would benefit from some unquantifiable
volume of summer tourist revenue,[8] the contracting
officer contends, as did the evaluator, that the residents at the port
of entry compound would not travel to the protester's facility except
for postal services not otherwise available from the HCR contractor.
"Mr. Deterding's location would not provide the day-to-day service
for the majority of the community to be served by the [CPU]."
-- Parking is sufficient for the business transacted by the four or five
customers per day who use the Border CPU.[9]
-- The protester understates the extent of Ms. Schwartz's previous
experience and the differences between private sector bookkeeping
experience and that required for "Government fund accounting."
-- Both offerors provided adequate personnel.
-- The protester's score was not diminished for the noncompatibility of
the nonpostal products offered.
-- GSA's involvement in providing facilities is a "non-issue."
-- The majority of Alaska's population is transient; the potential
length of the contract was not an evaluation criterion.
The contracting officer finds no basis to revise the evaluation scores
and recommends that the protest be denied.
Replying to the contracting officer's statement, the protester makes
the following points:
-- Both offers should have been evaluated equally for location as being
within the designated area.
-- That Ms. Schwartz's facility may be made handicapped accessible does
not mean that it is accessible, and her score should have been
diminished more substantially than it was for that failing. Given the
volume of tourists at this location, it is unrealistic to consider only
the local residents with respect to the requirement for accessibility.
-- With respect to customer usage, it was improper to consider
principally the residents, given the considerable summer tourist
traffic.[10] If only a small portion of this traffic
used the postal facility, significant revenue would be gained. (The
protester notes that the Border City Lodge sells approximately 25,000
postcards per year.) It is the inaccessibility of the Border CPU within
the port of entry compound which occasions its limited use by transient
individuals. It was "ludicrous" for the evaluator to suggest
that the residents would not travel three miles to obtain postal
services when the next nearest postal facility is fifty miles away.
-- The evaluator based her evaluation of the attractiveness and
suitability of the protester's facility on incomplete information
because she did not speak to Mr. Deterding in the course of the
evaluation. Had she done so, she would have known that upon completion
of the pending construction work, it was to be repainted. The evaluation
was also incorrect in suggesting that the offeror did not have a
specific area intended to house the postal facility.
-- The contracting officer's figures regarding revenue demonstrate the
inaccessibility of CPU sites within the compound and its
underutilization.
-- While the protester concedes some disparity between the offerors'
relevant experience, that disparity should not have been
disproportionately considered in the evaluation. The evaluator misstated
the number of employees available at the protester's location in
addition to Mr. Deterding. Two are available during winter, and as many
as ten are available during the summer.
-- The protester's score should have been increased for the availability
of compatible non-postal services.
The protester also submitted the affidavit of a resident of the port of
entry compound supporting the protester's contentions about the inadequacy
of parking within the compound and its inaccessibility to transients. The
affiant complains about the extent of the service provided by the CPU and
opines that the location of the facility at the Border City Lodge would
not deter its use by the local community. The affiant notes that the
Customs and Immigration installations receive their mail directly, not
through the CPU, and thus would not be affected by the change. The affiant
suggests the possibility of the evaluator's bias against Mr. Deterding and
in favor of Ms. Schwartz.
Ms. Schwartz has submitted comments contending that the residents of
the compound historically have been considered to comprise the Border
community and that the evaluation should not be revised. The comments were
accompanied by a letter from the Immigration and Naturalization Service
Port Director commending the current facility and contending that its
relocation would inconvenience and impact the mission of the INS.
The protester and his counsel participated in a telephonic protest
conference, and counsel subsequently submitted conference comments. Those
comments responded to this office's suggestion that even if the evaluation
of offers was not in accordance with the solicitation's requirements,
re-evaluation might not produce meaningful relief, because the requirement
might be restated in a manner consistent with the evaluator's reflection
of the actual requirement. The protester notes that an underlying purpose
of the protest process is to maintain the integrity of the procurement
process, a purpose which will be served if the protest is sustained. The
protester also proffers recently acquired information that GSA "has
denied Ms. Schwartz' request for . . . installation of handicapped
access" in the absence of funds for that purpose.
Discussion
Contract postal units are procured pursuant to Postal Service Handbook
AS-707F, July, 1989 (hereafter "handbook"). That handbook
establishes the standard evaluation factors for inclusion in the CPU
solicitation package, although the points to be assigned to each of the
three factors and the relationship of the business score to the price
score are to be proposed by the administrative post office requesting the
CPU (Handbook 2.2.2, 2.4). The handbook also offers guidance concerning
some of the issues involved in evaluation.[11]
In the negotiated acquisition of contract units, the successful
contractor is to be selected in accordance with the evaluation formula set
out in the RFP. The assignment of a numerical score by the evaluator is an
attempt to quantify essentially subjective judgments. Our review of such
an evaluation is limited to whether the evaluation was arbitrary or in
violation of any applicable procurement regulations. We do not substitute
our judgment for that of the evaluator or redo the evaluation. Illeane M.
Pierluissi, P.S. Protest No. 87-02, March 19, 1987.
In the instant case, it appears that the evaluator scored the competing
offers on a basis inconsistent with the evaluation scheme set out in the
solicitation. For example, the location factor had four subfactors (see
footnote 1). Mr. Deterding's facility was within the area designated by
the solicitation, easily accessible to handicapped and other customers,
and an appropriate distance from the nearest Postal Service facility. It
was faulted on only one subfactor, that its location was not likely to
stimulate usage by customers, and in that regard its score for location
was diminished by more than half. Since subfactors which are not assigned
specific weights are to be considered of approximately equal weight, Stone
and Webster Engineering Corporation, Comp. Gen. Dec. B-255286.2, April 12,
1994, 94-1 CPD 306, citing Informatics, Inc., Comp. Gen. Dec. B-194734,
Aug. 22, 1979, 79-2 CPD 144, the deduction of so many of the points for
this subfactor was inappropriate. Further, the evaluator downrated Mr.
Deterding's offer as less satisfactory for the residents of the Border,
AK, compound, without considering the site's attractiveness for
non-resident postal customers, and without fully justifying her conclusion
that its location three miles from the compound would make it
significantly inconvenient for the compound's residents.[12]
We take notice of the fact that the residents of the scattered small
communities of Alaska commonly are required to travel significant
distances to obtain goods or services. In those circumstances, it is less
than clear why Mr. Deterding's facility, which appears on this record to
be the closest commercial facility to the port of entry compound, is seen
as so inconvenient.
The size of the deduction assessed the protester for this subfactor
seems particularly inconsistent with the slight penalty (only one point)
assessed against the Schwartz proposal for the same factor for its
admitted failing with respect to handicapped accessibility. Such
accessibility was a requirement of equal weight with a site's potential
for customer usage, and the offeror's failure to offer a compliant
facility was a failing which the applicable directive (footnote 11, supra)
suggests should have all but disqualified it from consideration given the
availability of an accessible site.
Similarly, the protester's offer was downrated for its appearance under
the second factor, suitability of facility, despite the advice of the
offeror's representative that the facility, then under expansion or
renovation, "would meet appearance criteria." Neither the
evaluator's written explanation nor the contracting officer's statement
satisfactorily explain why that advice was apparently afforded no weight.[13]
Finally, neither the evaluator's explanation nor the contracting
officer's statement adequately account for the discrepancy in the two
offeror's scores for the ability to provide service. We gather that both
offerors provided sufficient personnel, had appropriate business
reputations, and provided no incompatible nonpostal services.[14]
If so, the nine point difference between the offeror's scores must relate
to the remaining subfactor, the ability to provide service. While Ms.
Schwartz's previous postal and contract experience no doubt afforded her
full credit for that element, neither the evaluator nor the contracting
officer have effectively established any reason to downrate Mr. Deterding
in that respect. Contrary to the contracting officer's suggestion, nothing
in the CPU contract or the handbook suggests the need for accounting or
bookkeeping skills in excess of those commonly used in the conduct of a
retail business.
For the reasons stated, we conclude that the evaluation was arbitrary
and inconsistent with the evaluation scheme of the solicitation.[15]
Accordingly, we turn to the matter of remedy. In an appropriate
circumstance, we may direct the re-evaluation of offers on a basis
consistent with the evaluation scheme set out in the solicitation.
Handling Systems, Inc., P.S. Protest No. 89-70, December 19, 1989.[16]
Nothing in the record before us suggests that the evaluator and the
contracting officer could not have rationally concluded in the
circumstances of this particular procurement that matters such as the
convenience of the residents of the Border port of entry compound were of
such significance as to outweigh other factors, such as convenience to
transient postal customers or the provision of accommodations for disabled
individuals.[17] A solicitation consistent with that
intent would not have included a desired location as broad as that
provided by the amended solicitation, would have discussed usage by
customers in terms relating to local residents to the exclusion of
transient customers, and would not have required immediate accessibility
by the handicapped.
All but the first of these suggested revisions would require deviations
from the handbook's established evaluation scheme. Such deviations may be
made when circumstances require.[18] The contracting
officer is directed to consider whether the Postal Service's needs with
respect to the Border CPU require such revisions to the solicitation, and
(with the acquisition of any appropriate deviations) to resolicit the
requirement in accordance with the Postal Service's actual needs. Should
the contracting officer conclude that no such revisions are required, the
existing offers should be re-evaluated on a basis consistent with the
criteria set out in the existing solicitation.
The protest is sustained to the extent indicated.
William J. Jones
Senior Counsel
Contract Protests and Policies
1. The solicitation set out the three factors of the business score and
their subfactors as follows:
Maximum Points
1. Suitability of Location 25
Is the proposed facility--
(a) Within the area designated by the solicitation?
(b) Easily accessible to handicapped and other
customers?
© In a location likely to stimulate usage by
customers?
(d) An appropriate distance from the nearest Postal
Service operated facility?
2. Suitability of Facility 25
(a) Is the proposed facility attractive, well
maintained, and in good repair?
(b) Is parking sufficient?
© Does the proposed facility have at least the
square footage required by the solicitation?
3. Ability to Provide Service 50
(a) Does the offeror have relevant experience?
(b) Does the offeror have personnel sufficient
to operate the facility or means of
obtaining them?
© Does the offeror have a good business reputation
and good standing in the community?
(d) Are any nonpostal services to be provided at the
facility compatible with the postal services to
be provided?
2. The points awarded to each business proposal were divided by the
highest number of points received to arrive at the offeror's business
score, and each offeror's annual rate was divided by the lowest annual
rate proposed to arrive at its price score. The final score of each
offer consisted of 40% of its business score and 50% of its price score.
3 . Each evaluation was accompanied by both hand-written and typed
explanations for the scores. The explanation for Ms. Schwartz's
evaluation is summarized below:
Suitability of Location
The location will better serve the majority of the community, the
school, and the three Federal agencies which are located near the
facility. It is easily accessed by transient customers after they pass
through Customs. It is well marked and has adequate parking. The
facility is not handicapped accessible, but the GSA "has indicated
that any alterations necessary will be immediately taken care of to
accommodate the Postal Service." The location will stimulate usage
by postal patrons.
Suitability of Facility
The facility is attractive, well maintained, and in good repair. It
presents an excellent image for the Postal Service. "[P]arking area
is sufficient." The facility has more than the required square
footage.
Ability to Provide Service
The offeror has been the emergency contractor since August 1, 1994, and
previously worked for the earlier contractor. She previously worked as a
leave replacement for the Northway post office. She is knowledgeable of
postal procedures and has relevant experience. One trained replacement
is available, and another is willing to train. The offeror has a good
business reputation and standing. No other services will be provided at
the facility.[6]
4 . The narrative explanation of Mr. Deterding's evaluation is summarized
below:
Suitability of Location
The facility is within the designated area; it is handicapped
accessible. "The proposed facility would be convenient to 8% of the
population of the area, therefore in the opinion of the evaluator, it
would not stimulate usage by the community members, school, service
organization[s] or federal agencies dependent on postal services."
The evaluator contends that the residents would use the facility only as
needed for services such as Express Mail and registered mail, and would
obtain other services from the highway contract route which serves the
area. However, postage sales at the proposed location "would
increase during the summer postal season."
Suitability of Facility
The building's exterior was unattractive due to guano stains from
nesting birds. The interior area was cluttered with packing materials
and building materials from ongoing building activity. The evaluator was
shown three proposed locations for the postal facility by the offeror's
representative, who assured the evaluator that the facility would meet
appearance criteria. The facility has adequate parking and offers more
square footage than is required.
Ability to Provide Service
The offeror has sales experience, but no postal experience; the offeror
has another person available to serve as a replacement. The offeror has
a good business reputation and standing in the community. The nonpostal
services are compatible with the postal services provided, although the
evaluator also expresses concern that the offeror's time would be
divided between the postal and non-postal services.
5. When the protest was filed, Mr. Deterding had been furnished the
evaluation scores, but had not been furnished the explanations which
accompanied them. We omit from the discussion of the protest points
which were raised on the basis of assumptions which were not borne out
by those explanations.
6. The protester contends that the only sign outside the compound
referring to the postal facility has been covered.
7. The protester surmises that the evaluator assumed, incorrectly, that
his facility had a liquor license; it does not.
8. The contracting officer notes, however, that postal facilities are
also available to tourists "at every organized city along the [Alaska]
highway," and she questions how many would stop at the Border City Lodge
after just having stopped at the port of entry.
9. FY 1992 revenue for the facility was $4,537; FY 1994 revenue was
$2,644. Revenue figures for the summer months of 1994 show average
revenues of between $6 and $13 per day. The contracting officer
contrasts these figures with the revenue figures for Northway, AK, and
Tok, AK, 95 miles to the north, each of which increased from FY 1992 to
FY 1994. He attributes the increases to tourist use of postal facilities
at Northway and Tok, each of which has more tourist facilities than
Border.
10. According to the protester, approximately 1,500 travelers enter
Alaska from Canada each summer day; no records are kept on southbound
traffic.
11 . For example, sections 2.3.2 and 2.3.3 provide as follows:
2.3.2 Location
The requesting office must specify location[] as precisely as is deemed
necessary. The best potential locations are in or adjacent to existing
business, working or shopping areas, and at sites where customers,
including the handicapped, have convenient access to parking or mass
transit.
2.3.3 Accessibility to the Handicapped
It is Postal Service policy to attempt to insure that all post offices,
including contract postal units, are readily accessible to all.
Contractors selected should be in locations readily accessible to the
handicapped. If a contract is awarded to a contractor whose premises are
not accessible, the contracting officer must document the contract file
to describe the attempts made to find other contractors with accessible
locations and describe the reasons for making the award.
12. The downrating for remoteness seems inconsistent with the fact that
the Border City Lodge was within the area specified by the amended
solicitation. While an offered facility within the designated area may
be evaluated as less satisfactory than another location also within the
designated area, the lower rating should relate to factors other than
location. See, e.g., Illeane M. Pierluissi, supra.
13. The protester's offer received only two-thirds of the available
points for the second factor. If it received full points for the second
and third subfactors, as to which the evaluator acknowledged the adequacy
of the facility's parking and square footage, it must have received no
points for the first subfactor, appearance.
14. We agree with the contracting officer that this last subfactor
warrants deductions for incompatible services, not credits for compatible
ones.
15. In the absence of an evaluation factor for potential length of the
CPU contract, we reject the protester's suggestion that that issue is
relevant to the evaluation. Similarly, we do not reach the suggestion
of bias or favoritism in the evaluation. "Prejudicial motives will not
be attributed to individuals on the basis of inferences or supposition."
Luther Benjamin and Associates, P.S. Protest No. 87-99, December 31,
1987.
16 . While an error in the weighting of evaluation factors need not
require re-evaluation of the offers if the offeror was not prejudiced by
the error, Stone & Webster Engineering Corporation, supra, prejudice can
be shown here. If each proposal had been scored appropriately for its
deficiency under the location factor (that is, if the protester's offer
lost one-fourth of the available location points for its perceived
remoteness, and Ms. Schwartz's offer similarly lost one-fourth of the
location points for its lack of access) the protester's proposal would
have been more advantageous than Ms. Schwartz's proposal under the
evaluation scheme of the solicitation.
Where award has already occurred, so that contract termination may be
necessary to afford relief, we also apply the following factors in
determining the appropriateness of a remedy:
Whether to require termination action in a given case depends on
consideration of such factors as the seriousness of the procurement
deficiency, the degree of prejudice to unsuccessful offerors or to the
integrity of the competitive procurement system, the good faith of the
parties, the extent of performance, the cost to the Government, the
urgency of the requirement, and the impact of termination on the
accomplishment of the agency's mission.
TPI International Airways, Inc., P.S. Protest No. 87-40, October 30,
1987.
Here, while the record suggests the good faith of the parties, the other
factors, including the fact that CPU contracts may be terminated on
notice in a manner which will not affect the provision of service,
support termination and remedial action.
17. Given the limited hours of operation which the solicitation sought,
it seems clear that the CPU is not intended to serve transient customers,
and that even the protester's offered facility would likely be of limited
usefulness to travellers.
18. CPU contracts are one of the structured contracts authorized by PM
8.6 which are under the control of the Vice President, Purchasing. PM
Exhibit 8.1.2. PM 1.4 discusses deviations from the requirements of the
Procurement Manual, and authorizes the Vice President, Purchasing, and
others to approve them in appropriate circumstances.
|